Tall Oaks

Colvin Run Watershed


Timeline Progress
Initial Watershed Study and Survey: COMPLETE
Phase I Archeological Investigation: COMPLETE
Concept Design: COMPLETE
Plan Design: COMPLETE
MBRT Approval: COMPLETE
Reston Design Review Board Approval: Final Plan Approved
County Approval: COMPLETE
Corps of Engineers Approval: COMPLETE
Construction: Pending

Plan Views

Final Plan- October 2011:
Final Overall Plan (1 of 9) [.pdf 1.5MB]
Final Grading Plan (2 of 9) [.pdf 1.3MB]
Final Grading Plan (3 of 9) [.pdf 1.3MB]
Final Grading Plan (4 of 9) [.pdf 1.1MB]
Final Planting Plan (5 of 9) [.pdf 1.5MB]
Final Planting Plan (6 of 9) [.pdf 1.3MB]
Planting Notes and Details (7 of 9) [.pdf 1.4MB]
Final Tree Removal Plan (8 of 9) [.pdf 1.1MB]
Final Tree Removal Plan (9 of 9) [.pdf 1.0MB]
Final Plan (All Sheets Above) [.pdf 14.0MB]
Tree List and Summary [.pdf 85KB]

Preliminary Plan- March 21, 2011:(This plan was superseded by the final plan above.)
Preliminary Plan Sheet 1 [.pdf 1.3MB]
Preliminary Plan Sheet 2 [.pdf 1.2MB]
Preliminary Plan (All Sheets) [.pdf 2.5MB]




Tall Oaks- Preconstruction Conditions Tall Oaks- Preconstruction Conditions Tall Oaks- Preconstruction Conditions Tall Oaks- Preconstruction Conditions Tall Oaks- Preconstruction Conditions Tall Oaks- Preconstruction Conditions Tall Oaks- Preconstruction Conditions
  • Tall Oaks- Preconstruction Conditions
  • Tall Oaks- Preconstruction Conditions
  • Tall Oaks- Preconstruction Conditions
  • Tall Oaks- Preconstruction Conditions
  • Tall Oaks- Preconstruction Conditions
  • Tall Oaks- Preconstruction Conditions
  • Tall Oaks- Preconstruction Conditions

Home Project Details Project Timeline FAQ Resources Contact Us

Copyright 2011 Wetland Studies and Solutions, Inc. The Wetland Studies and Solutions logo is a registered trademark of Wetland Studies and Solutions, Inc. All rights reserved