Timeline Progress
Initial Watershed Study and Survey: COMPLETE
Phase I Archeological Investigation: COMPLETE
Concept Design: COMPLETE
Final Plan: COMPLETE
MBRT Approval: APPROVED
Reston Design Review Board Approval: APPROVED July 24, 2007
County Approval: APPROVED January 25, 2008
VDOT Approval: APPROVED January 22, 2008
Construction: COMPLETE

Plan views: AVAILABLE [.pdf file; 1.4 MB]



Riffle construction in Snakeden Reach 1 at the beginning of a rain event. Construction in Snakeden Reach 1 Construction in Snakeden Reach 1 Construction of a riffle and cross vane sequence in Snakeden Reach 1 Cross-vane construction in Snakeden Reach 1 Construction in Snakeden Reach 1 Bridge construction in Snakeden Reach 1 Construction inspection in Snakeden Reach 1 Pre-construction conditions in Snakeden Reach 1: tall, vertical banks. Pre-construction conditions in Snakeden Reach 1: wide, incised channels. Pre-construction conditions in Snakeden Reach 1: undercut trees. Pre-construction conditions in Snakeden Reach 1: fallen trees and severe erosion. Post-construction conditions in Snakeden Reach 1 Post-construction conditions in Snakeden Reach 1 Post-construction conditions in Snakeden Reach 1 A new bridge in Snakeden Reach 1 Post-construction conditions in Snakeden Reach 1 Post-construction conditions in Snakeden Reach 1 Post-construction conditions in Snakeden Reach 1 Post-construction conditions in Snakeden Reach 1 during a rain event Post-construction conditions in Snakeden Reach 1 Post-construction conditions in Snakeden Reach 1 during a rain event.
  • Riffle construction in Snakeden Reach 1 at the beginning of a rain event.
  • Construction in Snakeden Reach 1
  • Construction in Snakeden Reach 1
  • Construction of a riffle and cross vane sequence in Snakeden Reach 1
  • Cross-vane construction in Snakeden Reach 1
  • Construction in Snakeden Reach 1
  • Bridge construction in Snakeden Reach 1
  • Construction inspection in Snakeden Reach 1
  • Pre-construction conditions in Snakeden Reach 1: tall, vertical banks.
  • Pre-construction conditions in Snakeden Reach 1: wide, incised channels.
  • Pre-construction conditions in Snakeden Reach 1: undercut trees.
  • Pre-construction conditions in Snakeden Reach 1: fallen trees and severe erosion.
  • Post-construction conditions in Snakeden Reach 1
  • Post-construction conditions in Snakeden Reach 1
  • Post-construction conditions in Snakeden Reach 1
  • A new bridge in Snakeden Reach 1
  • Post-construction conditions in Snakeden Reach 1
  • Post-construction conditions in Snakeden Reach 1
  • Post-construction conditions in Snakeden Reach 1
  • Post-construction conditions in Snakeden Reach 1 during a rain event
  • Post-construction conditions in Snakeden Reach 1
  • Post-construction conditions in Snakeden Reach 1 during a rain event.

Home Project Details Project Timeline FAQ Resources Contact Us

Copyright 2011 Wetland Studies and Solutions, Inc. The Wetland Studies and Solutions logo is a registered trademark of Wetland Studies and Solutions, Inc. All rights reserved