Home -- Snakeden Reaches 13 to 15 -- Pre-Restoration Photos
Looking downstream at Reach 15 from the existing bridge crossing. Riprap on the left side of the photo has washed away, exposing the filter fabric.
![]() |
![]() |
Pre-Construction Photos |
||||
|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Construction Photos |
||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||
Post-Construction Photos |
||||
First-Year Monitoring Photos |
||||